Lifting and Rigging


Lifting and Rigging Procedure


• LIFTING (OUTSIDE THE BUILDING)

1. Lifting of any kind of heavy machines / equipments using telescopic crane from ground to 10th floor (maximum) of the building.

2. Pull in the hanging machines / equipments from outside to inside the building using chain block.

• RIGGING (INSIDE THE BUILDING / PLANT)

1. Rigging of all kinds of heavy machines / equipments to final location regardless the weight and size

2. Positioning of all kinds of heavy machines / equipments using rollers / pallet jack / using L-jack regardless the weight and the size.